Baranagar metro station

Kolkata Metro's Blue Line metro station

22°39′13″N 88°22′44″E / 22.6535°N 88.3788°E / 22.6535; 88.3788Owned byMetro Railway, Kolkata
Kolkata Metro Rail CorporationOperated byKolkata MetroLine(s)
  Blue Line
Platforms2 (2 side platform)Tracks2Connections Baranagar RoadConstructionStructure typeElevated, Double trackParkingYesBicycle facilitiesNoAccessibleYes Disabled accessOther informationStatusOperationalHistoryOpened22 February 2021; 3 years ago (2021-02-22)
Services
Preceding station The logo of the Kolkata Metro. Kolkata Metro Following station
Dakshineswar
Terminus
Blue Line Noapara
towards Kavi Subhash
Route map
Legend
Chord link Line
to Dankuni
Dakshineswar ferry/water interchange
Pink Line to Barrackpore
Baranagar
Eastern Line
to Ranaghat
Noapara
Keshtopur Canal
Yellow Line to Barasat
Eastern Line
to Bongaon
Dum Dum
Belgachia
Circular Canal
Shyambazar
Sovabazar Sutanuti
Girish Park
Mahatma Gandhi Road
Central
Chandni Chowk
Green Line
← to Howrah Maidan
to Teghoria →
Esplanade
Park Street
Purple Line to Diamond Park
Maidan
Rabindra Sadan
Netaji Bhavan
Jatin Das Park
Kalighat
Tollygunge
Rabindra Sarobar
Mahanayak Uttam Kumar
Netaji
Masterda Surya Sen
Gitanjali
Kavi Nazrul
Shahid Khudiram
Orange Line to Jai Hind
Kavi Subhash
Location
Map

Baranagar, also known as JSW Baranagar is an elevated metro station on the North-South corridor of the Blue Line of Kolkata Metro which is off Barrackpore Trunk Road at Dunlop of Baranagar in Kolkata, West Bengal, India. Presently, this metro station is the tallest metro station of Kolkata (approximately 55 feet). The metro station adjoins the platforms of the Baranagar Road railway station where connections can be made with Indian Railways services.[1][2][3] [4] The station was inaugurated on 22 February 2021.[5]

History

Then in February 2019, the metro line to the Dakshineswar station was projected to be operational by February 2020.[6][7] A slightly delayed March 2020 projected operation date was announced in late 2019.[8] And a July 2020 projected operation date was mentioned in February 2020.[9][10] By June 2019, over 95 percent of the viaduct had been completed for the between Noapara and Dakshineswar and that work had begun on the signalling system and laying of the tracks.[11]

Station layout

L1
Platforms
Side platform, doors will open on the left
Platform 2      Blue Line toward Kavi Subhash (Noapara) Change at the next station for Yellow Line
Platform 1      Blue Line toward Dakshineswar (terminus)
Side platform, doors will open on the left
M Mezzanine Fare control, station agent, Metro Card vending machines, crossover
G Street level Exit/Entrance

Connections

Train

It is connected with Baranagar Road railway station of Chord link line of Kolkata Suburban Railway .

Bus

This station is connected with B.T. Road and Belghoria Expressway. Bus transport Bus route numbers 26, 26C, 32A, 34B, 56, 78, 78/1, 79, 81/1, 201, 214, 214A, 222, 230, 234, 234/1, 285, DN2, DN2/1, DN9/1, DN43, DN44, DN46, K4, S159 (Mini), S180 (Mini), S185 (Mini), C28, E32, S11, S15G, S23A, S32, S32A, S57, AC2B, AC20, AC23A, AC50, AC50A, AC54, EB1A etc. serve the station.[12][13]

Auto

Several auto services are available on B. T. Road towards Sodepur, Dakshineswar, Sinthee, Barrackpore.

See also

Baranagar metro station during construction

References

  1. ^ "Metro Railway Kolkata / Indian Railways Portal". mtp.indianrailways.gov.in. Retrieved 12 October 2019.
  2. ^ "New System Map of Kolkata Metro".
  3. ^ Express News Service (3 January 2010). "Mamata lays foundation for Dum Dum–Dakshineswar Metro". Express India. Retrieved 7 July 2012.
  4. ^ TNN. "Mamata paves way for Metro's northern journey". The Times of India. Retrieved 12 October 2019.
  5. ^ Team, BS Web. "LIVE: Bengal has made up its mind for 'poriborton', says PM Modi in Hooghly". www.business-standard.com. Retrieved 22 February 2021.
  6. ^ Gupta, Jayanta (13 December 2017). "It's final. Take a Metro ride to Dakshineswar by May 2019". The Times of India. Retrieved 18 September 2019.
  7. ^ Shah, Narendra (21 February 2019). "Noapara-Dakshineswar Metro Rail Project To Be Operational By Feb 2020". Metro Rail News. Retrieved 18 September 2019.
  8. ^ Mandal, Sanjay (13 October 2019). "March date for Noapara-Dakshineswar Metro line". The Telegraph. Retrieved 30 November 2019.
  9. ^ Gupta, Jayanta (6 February 2020). "West Bengal: Dakshineswar Metro line to hike rider count by 50,000". The Times of India. Retrieved 11 February 2020.
  10. ^ Mandal, Sanjay (2 February 2020). "July, revised date for Baranagar Metro". The Telegraph. Retrieved 11 February 2020.
  11. ^ Mandal, Sanjay (10 June 2019). "Expense boost for Calcutta Metro funds flow". The Telegraph. Retrieved 18 September 2019.
  12. ^ "Bus route | the Calcutta Tramways Company [1978] Ltd". Archived from the original on 18 August 2018. Retrieved 3 February 2018.
  13. ^ "Bus Services".

External links

Wikimedia Commons has media related to Baranagar metro station.
  • Official website for Kolkata Metro Line 1
  • UrbanRail.Net – descriptions of all metro systems in the world, each with a schematic map showing all stations.
  • Google. "Baranagar metro station" (Map). Google Maps. Google.
  • v
  • t
  • e
Governing bodyLocalities and streetsEducationTransportation
Road
Rail
Metro
Places of
worshipPeople
  • Category
  • Commons
  • Wikivoyage
  • v
  • t
  • e
Blue line
(Line 1)
Stations
Depots
Rakes


Green line
(Line 2)
Stations
Depots
Rakes
Purple Line
(Line 3)
Stations
Depots
Yellow Line
(Line 4)
Stations
Depots
Rakes
Pink Line
(Line 5)
Stations
  • Baranagar
  • Krishna Kali
  • Acharya Prafulla Chandra
  • Gandhi Ashram
  • Sarat Chandra
  • Subhas Nagar
  • Rishi Bankim
  • Dr. Rajendra Prasad
  • Shah Nawaz Khan
  • Anukul Thakur
  • Mangal Pandey
Depots
Orange Line
(Line 6)
Stations
Depots
See also