Greater Copenhagen Light Rail
- Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
- Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
- You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is
Content in this edit is translated from the existing Danish Wikipedia article at [[:da:Hovedstadens Letbane]]; see its history for attribution.
- You may also add the template
{{Translated|da|Hovedstadens Letbane}}
to the talk page. - For more guidance, see Wikipedia:Translation.
Map of the route |
---|
|
Greater Copenhagen Light Rail[3] (Danish: Hovedstadens Letbane, lit. 'The Capital City's Light Rail') is a planned electric light rail system crossing the lines of the S-train in Greater Copenhagen, Denmark, parallel to but outside the borders of Copenhagen Municipality. Its first stage is known as the Ring 3 Light Rail, for which construction started in 2018. It will go from Lundtofte Park north of Copenhagen to Ishøj station in the southwest, and it is expected to open in 2025,[1] with an annual ridership of 13-14 million projected.[1] The line will be owned by the Ringby-Letbanesamarbejdet (Ring city-Light rail cooperation), which is a collaboration between the municipalities serviced or affected by the line.
Background
Currently the rapid transit network of greater Copenhagen consists of a metro system serving the city centre, south-eastern suburbs and one western suburb, and a well-developed S-train network consisting of radial lines and one inner ring line relatively close to the city centre. Further from the city centre, transport between the radials consists of bus lines. Since the suburbs along the radials are expected to grow, a better quality public transport solution between them will be needed.[2] Furthermore, some high passenger volume destinations such as the Technical University and two hospitals are not yet directly accessible through rapid transit.
Services
Trains will depart every 5 minutes from both terminals[2] The trip between the terminals will be completed in 55 minutes.[4]
Stations
In total the line will have 29 stations, six of which will have a connection to the S-train network.[2]
Station | Travelling time -> (estimated) | Travelling time <- (estimated) |
---|---|---|
Lundtofte | 0 | 58 |
Rævehøjvej | 1 | 57 |
Anker Engelunds Vej | 3 | 55 |
Akademivej | 5 | 53 |
Fortunbyen | 7 | 51 |
Lyngby Centrum (Nærum Line) | 10 | 48 |
Lyngby station | 11 | 47 |
Gammelmosevej | 15 | 43 |
Buddinge station | 17 | 41 |
Gladsaxe Rådhus (Town Hall) | 18 | 40 |
Gladsaxevej | 20 | 38 |
Gladsaxe Trafikplads | 21 | 37 |
Dynamovej | 23 | 35 |
Herlev Hospital | 25 | 33 |
Herlev Bymidte (Centre) | 27 | 31 |
Herlev station | 28 | 30 |
Herlev Syd (South) | 30 | 28 |
Rødovre Nord (North) | 31 | 27 |
Glostrup Ejby | 33 | 25 |
Glostrup Nord (North) | 36 | 22 |
Glostrup Hospital | 38 | 20 |
Glostrup station | 43 | 15 |
Kirkebjerg | 46 | 12 |
Brøndbyvester | 48 | 10 |
Delta Park | 51 | 7 |
Vallensbæk station | 52 | 6 |
Strandhaven | 54 | 4 |
Ishøj Strand (Beach) | 55 | 3 |
Ishøj station | 58 | 0 |
Source:[5]
Financing and ownership
The line will be owned through the Ringby-Light rail cooperation by the Ministry of Transport, Capital Region of Denmark and the municipalities of Lyngby-Taarbæk, Gladsaxe, Herlev, Albertslund (no station;in Glostrup, bordering Albertslund), Rødovre, Glostrup, Brøndby, Hvidovre (no station), Vallensbæk, Ishøj and Høje-Taastrup (no station). The Danish state will contribute 40% to the construction, the municipalities 34% and the Capital Region of Denmark will contribute 26%.[2]
Further expansions
Several expansion stages are proposed, including a branch from Park Allé via Brøndby Stadium and Brøndby Strand station to Avedøre Holme. This can also be extended to Copenhagen Airport. Likewise, a northern extension to Kokkedal Station is proposed. This, together with an HH-connection may be a small part of a future ring around the Øresund with rail traffic.
See also
- v
- t
- e
- Copenhagen S-train
- Aalborg Commuter Rail
- Nærum Line
- Øresundståg
- Aarhus Letbane
- Greater Copenhagen Light Rail
- Odense Letbane
External links
- Project website
- The line in the Copenhagen region rapid transit network (in yellow) Archived 2016-03-10 at the Wayback Machine
- Planned course of the line
References
- ^ a b c "Siden blev ikke fundet". Archived from the original on 2018-08-21. Retrieved 2018-08-21.
- ^ a b c d e "L for Letbane". Hovedstadens Letbane. November 5, 2015.
- ^ "Siden blev ikke fundet". Archived from the original on 2019-08-22. Retrieved 2017-06-16.
- ^ "Ring 3 Light Rail, Copenhagen, Denmark". railway-technology.com.
- ^ https://www.ft.dk/samling/20181/almdel/tru/spm/457/svar/1571924/2041243.pdf [bare URL PDF]