Pulau Muara Besar Bridge
Pulau Muara Besar Bridge is a dual-carriageway bridge which connects Pulau Muara Besar, an island on Brunei Bay, with the mainland of Brunei via Serasa in Brunei-Muara District.[1][2] The bridge is 2,680 metres (8,790 feet) long and 23 metres (75 feet) wide.[3][1] The construction began in 2015 and completed in May 2018;[4] it was undertaken by China Harbour Engineering Company at a cost of B$260 million or US$204 million.[2][5][6] The bridge is part of the road infrastructure that will serve the petrochemical refinery plant on the island, which is currently under construction, and is a Chinese foreign direct investment.[7][8] At present, access to the bridge is restricted to authorised personnels of the project.[9]
References
- ^ a b "Brunei: Pulau Muara Besar Bridge nears completion". www.worldhighways.com. Retrieved 2018-03-19.
- ^ a b "PMB bridge project goes to Chinese contractor | The BT Archive". btarchive.org. Retrieved 2018-03-19.
- ^ "Main span of China-made bridge closed in Brunei - Xinhua | English.news.cn". www.xinhuanet.com. Archived from the original on December 27, 2017. Retrieved 2018-03-19.
- ^ "PMB Bridge Was Recently Completed In May 2018 | Brunei's No.1 News Website". www.brudirect.com. Retrieved 2018-08-04.
- ^ "CHEC to complete Brunei's Pulau Muara Besar Bridge by next April_Xinhua Finance Agency". en.xfafinance.com. Retrieved 2018-03-19.
- ^ "China Harbor Engineering picks up Brunei's Muara Besar project". www.worldhighways.com. Retrieved 2018-03-19.
- ^ "Hengyi invests USD 12 billion for Pulau Muara Besar second phase | Biz Brunei". www.bizbrunei.com. Retrieved 2018-08-04.
- ^ "A look at Hengyi's Pulau Muara Besar project | Borneo Bulletin Online". borneobulletin.com.bn. Retrieved 2018-08-04.
- ^ "Access restricted to PMB Bridge | Borneo Bulletin Online". borneobulletin.com.bn. Retrieved 2018-08-04.
- v
- t
- e