Uganda National Roads Authority
- Allen Kagina[3],
Executive director
The Uganda National Roads Authority (UNRA) is a government agency mandated to develop and maintain the national roads network, advise the government on general roads policy, contribute to the addressing of national transport concerns, and perform certain other functions.[4] UNRA is charged with, among other things, the selection of contractors, the supervision of construction, the scheduling of maintenance, and the prioritization of national road works.[5]
Headquarters
The headquarters of UNRA are located in the UAP Nakawa Business Park, at 3-5 New Port Bell Road, in the Nakawa Division of Kampala, Uganda's capital and largest city.[6] The geographical coordinates of UNRA's headquarters are:0°19'40.0"N, 32°36'46.0"E (Longitude:0.327778; Latitude:32.612778).[7]
Overview
UNRA was established in 2006 by parliamentary enactment of the Uganda National Roads Authority Act.[4] UNRA became fully operational on 1 July 2008.[4]
UNRA is governed by a nine-member board of directors, chaired by Angela Kanyima Kiryabwire. The first Chairman of the Board of Directors was Mr. Chris Kassami who spearheaded the process of setting up the original UNRA management structures. The pioneer Executive Director was Eng. Peter Ssebanakitta who was appointed to the post on 1 November 2007 and set upon working with the Board to recruit staff into the UNRA structures. UNRA became operational on 1 July 2008 with about 80% of the established posts filled. Eng. Ssebanakitta served as Executive Director up to 3 March 2013 when he resigned for personal reasons. He was succeeded in acting capacity by Engineer Ssebbugga Kimeze who was subsequently replaced by Eng. James Okiror when he was suspended following the botched procurement of a contractor for the Mukono–Kyetume–Katosi–Nyenga Road. The current executive director is Allen Kagina who replaced Engineer Okiror in May 2014.[8] She replaced acting executive director James Okiror.[9]
Completed projects
During the first five years of the agency, the road network increased from 10,800 kilometres (6,700 mi) to 21,000 kilometres (13,000 mi).[10]
According to a published report in July 2015, 4,000 kilometres (2,500 mi) (19 percent) of the 21,000 kilometres (13,000 mi) national road network was paved.[11] A total of 1,500 kilometres (930 mi) of roads were improved from gravel to bituminous surface between 2005 and 2010.[12] A total of 5,000 kilometres (3,107 mi) of roads are earmarked for tarmacking before December 2016.[13]
Some of the roads that have been completed since 2008 include:
- Kabale–Kisoro–Bunagana Road (completed in 2012)[10][14][15]
- Fort Portal–Bundibugyo–Lamia Road (completed in March 2014)[16]
- Gayaza-Ziroobwe Road[10][17]
- Matugga-Kapeeka Road[10]
- Soroti–Dokolo–Lira Road (completed in 2010)[18]
- Jinja–Bugiri Road (completed in 2010)[19][20]
- Kampala–Mityana Road (completed in July 2012)[21]
- Masaka–Mbarara Road[22]
- Lira–Kamdini–Karuma Road (completed in August 2011)[23]
- Kazo–Ibanda–Kamwenge Road (completed in March 2014)[24][25]
- Nyakahita–Kazo Road (completed in February 2014)[26]
Ongoing construction projects
As of October 2017, the following major construction projects under UNRA's supervision were ongoing.
- Gulu–Atiak–Nimule Road[27][28]
- Tororo–Mbale–Soroti Road[27][29]
- Vurra–Arua–Koboko–Oraba Road[27][30]
- Mbarara Northern Bypass Road[27][31]
- Kampala Northern Bypass Highway[27][32]
- Mbarara–Ntungamo–Kabale–Katuna Road[27][33]
- Entebbe-Kampala Expressway[27][34]
- New Jinja Bridge[30][35]
- Mukono–Kyetume–Katosi–Nyenga Road[27][36]
- Hoima–Kaiso–Tonya Road[37][38]
- Hoima–Butiaba–Wanseko Road[39]
- Kampala–Mpigi Expressway[40]
Upcoming projects
As of June 2015, UNRA listed the following major construction projects as upcoming:
Re-organization
As part of a re-organization and re-structuring effort, Allen Kagina, the executive director, fired all the remaining 866 company staff and re-advertised all staff positions.[45] The terminations were in addition to 80 managers fired in June 2015,[46] and another 58 staff laid off in September 2015 when the procurement and weighbridge departments were outsourced.[47][48] In January 2016, media reports indicated that the total staff allocation for the organization had been increased to 1,740.[49]
Governance
In March 2017, new board of directors was named to serve for three years. The members of the current board are:[50]
- Fred Omach: Chairman
- Allen Kagina: Executive Director
- Sam Bagonza: Member
- Umar Bagampadde: Member
- Joseph Muvawala: Member
- Laban Mbulamuko: Member
- Petra Sansa Tenywa: Member.
See also
References
- ^ Wesonga, Nelson (23 September 2016). "UNRA wants more 450 employees". Daily Monitor. Kampala. Retrieved 24 September 2016.
- ^ Mwesigwa, Alon (8 April 2015). "Budget: gvt will not take on new road projects". The Observer (Uganda). Retrieved 1 July 2015.
- ^ Lumu, David (27 April 2015). "Kagina is new executive director of UNRA". New Vision. Kampala. Retrieved 27 April 2015.
- ^ a b c Rwanyekiro, Isaiah (16 July 2014). "Uganda connected border-to-border by tarmac". New Vision. Kampala. Retrieved 1 July 2015.
- ^ UNRA (6 July 2015). "About UNRA: Road Network". Uganda National Roads Authority (UNRA). Retrieved 6 July 2015.
- ^ "Uganda National Roads Authority: Contact Us". Kampala: Uganda National Roads Authority (UNRA). 30 October 2017. Retrieved 30 October 2017.
- ^ Google (30 October 2017). "Location of the headquarters of Uganda National Roads Authority (UNRA)" (Map). Google Maps. Google. Retrieved 30 October 2017.
- ^ Bwire, Nelson (27 April 2015). "Allen Kagina to head UNRA". Daily Monitor. Kampala. Retrieved 27 April 2015.
- ^ Paul Tajuba, and Frederic Musisi (30 August 2014). "Board suspends UNRA managers". Kampala. Retrieved 30 October 2017.
- ^ a b c d Muleme, Geoffrey (11 September 2013). "UNRA Undertakes Road Development Project In Uganda". AfricanReview.com. Retrieved 19 June 2014.
- ^ Bwambale, Taddeo (30 June 2015). "UNRA reviews contractors, donors warn against personalities". New Vision. Retrieved 1 July 2015.
- ^ "1,500km of roads tarmacked in past five years". New Vision. Kampala. 30 December 2015. Retrieved 28 June 2015.
- ^ EAAB (1 January 2015). "UNRA paves 1200km roads; 5,000km for tarmacking by 2016". East Africa Agribusiness (EAAB). Archived from the original on 12 July 2015. Retrieved 16 July 2015.
- ^ Balagadde, Samuel (7 October 2012). "Kabale-Kisoro road upgraded". New Vision. Kampala. Retrieved 28 June 2015.
- ^ UNRA (2015). "KABALE-KISORO-BUNAGANA ROAD (100KM)". Uganda National Roads Authority. Retrieved 1 July 2015.
- ^ UNRA (1 July 2015). "Fort Portal – Bundibugyo-Lamia (Funded by AfDB/GOU)". Uganda National Roads Authority. Retrieved 1 July 2015.
- ^ UNRA (2015). "Kampala-Gayaza-Zirobwe (44Km)". Uganda National Roads Authority. Retrieved 1 July 2015.
- ^ UNRA (2015). "Soroti-Dokolo – Lira Road (123km)". Uganda National Roads Authority. Retrieved 1 July 2015.
- ^ UNRA (2015). "Jinja-Bugiri Road (72KM)". Uganda National Roads Authority. Retrieved 1 July 2015.
- ^ Solomon Muyita, and Fredrick Sooma (11 January 2010). "Jinja-Bugiri road opens after five years of waiting". Daily Monitor. Kampala. Retrieved 28 June 2015.
- ^ UNRA (2015). "Busega-Mityana road (57Km)". Uganda National Roads Authority. Retrieved 1 July 2015.
- ^ UNRA (2015). "Masaka-Mbarara road (154.2km)". Uganda National Roads Authority. Retrieved 1 July 2015.
- ^ UNRA (2015). "Lira – Kamdini - Karuma". Uganda National Roads Authority. Retrieved 1 July 2015.
- ^ UNRA (2015). "Kazo – Kamwenge (Funded by AfDB/GOU)". Uganda National Roads Authority. Retrieved 1 July 2015.
- ^ UNRA (2015). "Kazo-Kamwenge Road (75km)". Uganda National Roads Authority. Retrieved 1 July 2015.
- ^ UNRA (2015). "Nyakahita-Kazo (Funded by AfDB/GOU)". Uganda National Roads Authority. Retrieved 1 July 2015.
- ^ a b c d e f g h UNRA. "ongoing major projects". Uganda National Roads Authority (UNRA). Retrieved 1 July 2015.
- ^ Apiliga, Francis (1 June 2011). "UNRA gets US $100 Million for Gulu-Nimule road". Uganda Radio Network. Retrieved 28 June 2015.
- ^ Sekanjako, Henry (25 July 2012). "Delayed Tororo-Mbale-Soroti road to cost more money". New Vision. Kampala. Retrieved 21 June 2014.
- ^ a b EAAB (5 June 2014). "INFRASTRUCTURE DEVELOPMENT BOOSTING THE AGRICULTURAL SECTOR". East Africa Agribusiness (EAAB). Retrieved 28 June 2015.
- ^ Nahamya, Joshua (1 March 2015). "Mbarara Bypass Construction Underway". Chimpreports.com. Retrieved 28 June 2015.
- ^ Anguyo, Innocent (13 May 2014). "Portuguese firm awarded sh200b Northern Bypass contract". New Vision. Kampala. Retrieved 28 June 2015.
- ^ Maseruka, Josephine (2013). "Corruption cited in Mbarara-Katuna road reconstruction". New Vision Mobile. Kampala. Archived from the original on 2015-06-30. Retrieved 28 June 2015.
- ^ Malaba, Tom (30 January 2014). "UNRA to Compensate People Affected by Entebbe Expressway Next month". Uganda Radio Network (URN). Retrieved 19 June 2014.
- ^ UNRA (2015). "Major Bridges under construction". Uganda National Roads Authority. Retrieved 1 July 2015.
- ^ Kasozi, Ephraim (15 January 2015). "UNRA gives new Katosi deal to SBI". Daily Monitor Mobile. Kampala. Retrieved 28 June 2015.
- ^ Vision, Reporter (11 August 2011). "Hoima-Kaiso Tonya road works start". New Vision. Kampala. Archived from the original on 16 August 2011. Retrieved 20 June 2014.
- ^ Otage, Stephen (28 April 2014). "Hoima-Tonya road to be ready by July". Daily Monitor. Kampala. Retrieved 20 June 2014.
- ^ Arinaitwe, Solomon (7 May 2014). "Works ministry needs Shs130 billion for road projects in Bunyoro". Daily Monitor. Kampala. Retrieved 20 June 2014.
- ^ Musisi, Frederic (30 December 2016). "Kampala-Mpigi Expressway project kicks off in 2018". Daily Monitor. Kampala. Retrieved 30 October 2017.
- ^ UNRA. "Kigumba-Masindi-Hoima-Bulima-Kabwoya (Funded by AfDB/GOU)". Uganda National Roads Authority. Retrieved 1 July 2015.
- ^ Rwothungeyo, Billy (2012). "Hoima-Butiaba-Wanseko road for upgrade". New Vision Mobile. Kampala. Retrieved 20 June 2014.
- ^ UNRA. "Rukungiri-Kihihi-Ishasha-Kambuga/Kihihi-Kanungu-Kambuga (Funded by AfDB/GOU)". Uganda National Roads Authority. Retrieved 1 July 2015.
- ^ Kagenda, Patrick (15 June 2015). "Uganda: AfDB Gives Uganda U.S. $109 Million for Roads". The Independent (Uganda) via AllAfrica.com. Retrieved 28 June 2015.
- ^ Kasozi, Ephraim (29 September 2015). "UNRA sacks all employees". Daily Monitor. Kampala. Retrieved 29 September 2015.
- ^ Musisi, Frederic (23 June 2015). "Kagina fires 80 UNRA staff". Daily Monitor. Kampala. Retrieved 29 September 2015.
- ^ Ahimbisibwe, Patience (16 September 2015). "Kagina lays off 50 more UNRA staff". Daily Monitor. Kampala. Retrieved 29 September 2015.
- ^ Namutebi, Joyce (16 July 2015). "MPs query UNRA top managers' sacking". New Vision. Kampala. Retrieved 17 July 2015.
- ^ Wesonga, Nelson (29 January 2016). "EU queries planned UNRA 1,740 recruitment". Daily Monitor. Kampala. Retrieved 29 January 2016.
- ^ Mafabi, David (15 March 2017). "Ex-minister Omach to head UNRA board". Daily Monitor. Kampala. Retrieved 25 March 2019.
External links
- Uganda National Roads Authority Website
- Is The Huge Road Sector Budget Allocation Doing Wonders?
- UNRA: Construction of the Kampala – Jinja Expressway
- Regional Imbalance: The Story of Road Construction In Uganda
- UNRA At 6 Years - 1 July 2014
00°19′40″N 32°36′46″E / 0.32778°N 32.61278°E / 0.32778; 32.61278
- v
- t
- e
- Banda
- Bugoloobi
- Bukoto
- Busega
- Butabika
- Bwaise
- Ggaba
- Kabalagala
- Kamwookya
- Kansanga
- Kaleerwe
- Kanyanya
- Kasubi
- Katwe
- Kawaala
- Kawempe
- Kibuli
- Kibuye
- Kigoowa
- Kikaaya
- Kisaasi
- Kiwaatule
- Kulambiro
- Kololo
- Kyambogo
- Kyebando
- Lubaga
- Lungujja
- Luzira
- Makerere
- Makindye
- Mbuya
- Mengo
- Mpererwe
- Mulago
- Munyonyo
- Muyenga
- Naakulabye
- Naguru
- Najjanankumbi
- Nakasero
- Nakawa
- Nakawa–Naguru Estates
- Namirembe
- Namungoona
- Namuwongo
- Nateete
- Ndeeba
- Nsambya
- Ntinda
- Old Kampala
- Port Bell
- Wandegeya
- Daily Monitor
- New Vision
- New Vision Group
- The Independent (Uganda)
- The Observer (Uganda)
- Dott Services
- National Housing and Construction Company
- Tirupati Development Uganda Limited
- Insurance Regulatory Authority of Uganda
- National Food and Drug Authority
- National Planning Authority
- National Identification and Registration Authority
- National Social Security Fund
- National Water and Sewerage Corporation
- Uganda Securities Exchange
- Uganda Investment Authority
- Ruparelia Group
- Kyagalanyi Coffee Limited
- Brookside Dairy Limited
- Jesa Farm Dairy Limited
- Uganda Retirement Benefits Regulatory Authority
- Uganda Land Commission
- Capital Markets Authority of Uganda
- Uganda Coffee Development Authority
- ROKO Construction Company
- Uganda Business Facilitation Centre
- Uganda Air Cargo
- Uganda Airlines
- Kampala Airport
- Uganda National Roads Authority
- Entebbe–Kampala Expressway
- Kampala–Jinja Expressway
- Kampala–Jinja Highway
- Kampala–Entebbe Road
- Kampala–Gayaza Road
- Kampala–Bombo Expressway
- Kampala–Busunju Expressway
- Kampala–Mpigi Expressway
- Kampala–Masaka Road
- Kampala–Mityana Road
- Kampala–Hoima Road
- Kampala Northern Bypass Highway
- Kampala Southern Bypass Highway
- Kampala Outer Beltway
- Tondeka Metro Bus Service
landmarks
- Afrexim Bank House, Kampala
- Bulange
- Christ the King Catholic Church
- Uganda Parliament Buildings
- Kampala Capital City Authority Complex
- DFCU House
- Kampala Protea Hotel
- Kampala Hilton Garden Inn
- Kampala Hilton Hotel
- Kampala Serena Hotel
- Kampala Sheraton Hotel
- Imperial Hotels Group
- Imperial Royale Hotel
- Grand Imperial Hotel
- Janani Luwum Church House
- Kampala Kingdom Hotel
- Kampala Speke Hotel
- Mapeera House
- Movement House
- Munyonyo Commonwealth Resort
- Thobani Centre
- Speke Resort and Conference Center
- East African Development Bank Building
- Bank of Uganda Building Complex
- Mengo Palace
- Kabaka's Place Banda
- Namirembe Cathedral
- Rubaga Cathedral
- Makerere University Main Campus
- National Water and Sewerage Corporation Headquarters Building
- Kampala Tower
- Hotel Africana
- Kibuli Mosque
- Old Kampala Mosque
- Uganda Inspectorate of Government Towers
- Uganda Ministry of Education Complex
- Uganda Museum
- Uganda National Cultural Centre
- Uganda National Records Centre and Archives
- Kasubi Tombs
- DFCU House
- Pension Towers
- JLOS House Project
- Roman Catholic Archdiocese of Kampala
- Aga Khan University, Kampala
- Cavendish University Uganda
- Clarke International University
- Habib Medical School
- Institute of Petroleum Studies Kampala
- International Health Sciences University
- International University of East Africa
- ISBAT University
- Kampala International School
- Kampala University
- Kibuli Secondary School
- Kitante Hill Secondary School
- Kololo Senior Secondary School
- Kyambogo University
- Law Development Centre
- Makerere College School
- Makerere University
- Makerere University Business School
- Mengo Senior School
- Nabisunsa Girls' Secondary School
- Nakawa Vocational Training Institute
- Nexus International University
- Rubaga Community School
- Stafford University Uganda
- St. Augustine International University
- St. Lawrence University
- Uganda Christian University School of Medicine
- Team University
- Uganda Industrial Research Institute
- Uganda Management Institute
- Uganda Martyrs University School of Medicine
- Uganda National Entrepreneurship Development Institute
- Uganda Technology and Management University
- Victoria University Uganda
- Uganda National Council for Higher Education
- Aga Khan University Hospital, Kampala
- Butabika Hospital
- Case Medical Centre
- International Hospital Kampala
- Kadic Hospital
- Kampala Hospital
- Kampala Medical Chambers Hospital
- Kawempe General Hospital
- Kibuli Hospital
- Kiruddu General Hospital
- Lubaga Hospital
- Makerere University Hospital
- Mbuya Military Hospital
- Mengo Hospital
- Mulago Hospital
- Mulago Women's Referral Hospital
- Murchison Bay Hospital
- Upper Mulago Regional Referral Hospital
- Nakasero Hospital
- Naguru General Hospital
- Nsambya Hospital
- Paragon Hospital
- Uganda Cancer Institute
- Uganda Heart Institute
- Uganda Medical and Dental Practitioners Council
- Women's Hospital International and Fertility Centre
- Galilee Community General Jewish Hospital of Uganda
- International Medical Group
- Uganda Joint Medical Store
- A.F. Mpanga Advocates
- ENSafrica
- Kampala Associated Advocates
- Kasirye Byaruhanga and Company Advocates
- Kateera & Kagumire Advocates
- Katende Ssempebwa & Company Advocates
- Kigozi Ssempala Mukasa Obonyo Advocates
- Ligomarc Advocates
- Sebalu & Lule Advocates
- Apolo Nsibambi
- Nasser Sebaggala
- David Serwadda
- Fred Ruhindi
- John Ssebaana Kizito
- Bulaimu Muwanga Kibirige
- Erias Lukwago
- Ian Clarke
- Jennifer Musisi
- Josephine Nambooze
- Maria Kiwanuka
- Laurence Sematimba
- Joseph Kizito
- Justinian Tamusuza
- Robert Ssejjemba
- Eugene Sseppuya
- Phillip Ssozi
- Sudhir Ruparelia
- Wasswa Serwanga
- Yusef Sozi
- Margaret Zziwa
- Beti Kamya-Turwomwe
- Moses Matovu
- Mohammed Hamid
- Hasmukh Dawda